FAQs

Answers to the questions we are asked most often.

The Consultation

What is this consultation about?
AMA (New Town) Limited is sharing emerging proposals for Summerhall, Edinburgh, and would like to hear the views of the local community before a planning application is submitted.
When and where is the first in person consultation event?
The event is on Wednesday 7 October 2026 at Summerhall, 1 Summerhall, Edinburgh EH9 1PL. 3pm – 7.30pm (drop in any time). Get directions.
How can I give feedback?
You can fill in the online feedback form at any time, or complete a feedback form in person at the public event. You can also email your comments to info@summerhallconsultation.co.uk, or post them to Calton Planning + Development, 10 Rutland Square, Edinburgh EH1 2AS.
How do I contact the Project Team?
Email the Project Team at info@summerhallconsultation.co.uk with any queries, or to request this information in an alternative format.
When does the consultation close?
The consultation closes on Friday 23rd October 2026.
What happens to my feedback?
All feedback is read by the project team. Comments will be summarised in a Pre-Application Consultation (‘PAC’) Report that is submitted with the planning application. Your personal details will not be published. See our Privacy Notice for full details.

The Proposals

What is being proposed?

‘Partial selective demolition of existing buildings and redevelopment of the site for mixed use development comprising an arts centre cultural, community and venue spaces (Use Classes 1A, 3, 4, 10, 11); commercial leisure and food/drink, small retail (Use Classes 1A, 3, 11); commercial business space for employment/office space (); hotel/leisure visitor accommodation and venue spaces ( with ancillary Classes 3, 10, 11); residential accommodation in a blend of , and apartments (); associated amenity space, landscaping, infrastructure and ancillary works’

How will the proposals consider heritage impacts from the development?

Heritage considerations have been embedded within the design development process from an early stage. A comprehensive Heritage Appraisal has been undertaken by Turley Heritage to establish the significance of the various elements of the building complex. This has also been informed by detailed site analysis undertaken by the appointed Architects, Kettle Collective, alongside a structural survey completed by Arup.

A full that considers the proposals in respect of the site’s and status will be undertaken by Turley Heritage in support of the forthcoming application. This will be available to view once the application is submitted.

Will you be undertaking an Air Quality Assessment?
Yes, an will be instructed to consider any changes in the concentration of nitrogen dioxide and particulate matter, as well as take into account increases in development traffic and dust from site clearance / construction. Once the application has been submitted, the Assessment will be available to view.
Will there be any disruption during construction?
Details of construction mitigation measures will be provided within the suite of technical documents ( and ) that support the planning application. If needed, mitigation measures will also be a requirement of attached to the planning permission.

Planning

Has a planning application been submitted?
Not yet. This is a pre-application consultation. We will consider all feedback before submitting an application to The City of Edinburgh Council.
What is a full / detailed planning application?
A is required when making detailed proposals for developments which are not covered by a householder application or permitted development rights.
When will the planning application be submitted?
Following the second round of public consultation, AMA will consider your comments, and those from the Council, Councillors and other relevant stakeholders. This feedback will help AMA to develop and finalise the scheme for planning submission. The proposed development is also required to be supported by a full suite of technical assessments. In view of this, the planning application is expected, at the earliest, to be submitted early 2027.
Will I be able to comment on the planning application once submitted?

Yes, you will be able to comment on the application through the Council’s public access portal. We will update our public consultation website once the application is submitted with the application’s reference number and link to the page.

Comments made at this stage are to the prospective applicant, AMA (New Town) Limited, and are not representations to the planning authority. When a planning application is submitted, you will have the opportunity to make representations to The City of Edinburgh Council.

Glossary

Planning and heritage terms used in the consultation, explained. 41 terms.

Air Quality Impact Assessment

An assessment used to determine the relative contribution to pollutant concentrations of specific current or future source emissions at receptor sites.

Biodiversity Net Gain (BNG)

Is a way of creating and improving natural habitats. BNG makes sure development has a measurably positive impact (‘net gain’) on biodiversity, compared to what was there before development.

Built to Rent

Purpose built housing that is typically 100% rented out. It can form part of a wider multi-tenure development comprising either flats or houses, but should be on the same site and/or contiguous with the main development. Schemes will typically be professionally managed stock in single ownership and management control.

Class 1A Retail

Shops, hairdressers, travel and tickets agencies, post offices, cold food shops such as sandwich bars, undertakers, funeral directors, launderettes/dry cleaners and repair shops.

Financial services such as banks and building societies; professional services including estate and employment agencies; and other services which is appropriate to provide in a shopping area and where the sale, display or service is principally to visiting members of the public.

Class 3 Food and Drink

Premises for the sale of food or drink for consumption on the premises.

Class 4 Business
  • Offices not within Class 1A
  • Research and development
  • Light industry
Class 6 Storage

Storage or distribution.

Class 7 Hotel

Hotels, boarding houses, guest houses and hostels.

Class 10 Non-Residential Institution

Crèches, day nurseries, day centres, schools and colleges, art galleries / centre, museums, exhibition halls, public libraries and places for social activities of a religious body

Class 11 Leisure

Cinemas, concert halls, bingo halls, casinos, dance halls, discotheques, skating rinks, swimming baths and gymnasiums.

Conservation Area

Conservation Areas are areas which have special architectural or historic interest that are considered worthy of protection. Their selection, assessment and designation is carried out by the planning authority. To be designated as a Conservation Area it must meet the criteria of ‘special architectural or historic interest the character or appearance of which is desirable to preserve or enhance’, as set out in Section 61 of the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997.

Conservation / Conserve (for heritage policy)

The process of maintaining and managing change to a heritage asset in a way that sustains, preserves and, where appropriate, enhances its significance.

Construction Demolition Method Statement

States in a logical, step-by-step manner, how a specific task should be undertaken. It considers the health and safety implications of a task and contains the control measures that should be followed to reduce risk.

Construction Environmental Management Plan

A document that outlines how a developer will minimise any negative environmental impacts of a specific construction project. It should demonstrate that the construction project complies with the relevant environmental legislation.

Cultural Significance

Cultural significance means aesthetic, historic, scientific or social value for past, present or future generations. Cultural significance can be embodied in a place itself, its fabric, setting, use, associations, meanings, records, related places and related objects.

Density

Density is either defined in terms of the number of units or the number of habitable rooms per hectare.

Designated Heritage Asset

A World Heritage Site, Scheduled Monument, Listed Building, Garden and Designed Landscape or Battlefield included in the Inventory, Historic Marine Protected Area or Conservation Area designated under the relevant legislation.

Detailed Application / Full Planning Application

A full planning application is required when making detailed proposals for developments which are not covered by a householder application or permitted development rights.

Enabling Development

Enabling development is development that would otherwise be unacceptable in planning terms, but is essential, to secure the future of an historic environment asset or place which is at risk of serious deterioration or loss.

Fabric-first

Reduces energy needs through improved design and construction. This approach focuses on improving u-values, reducing thermal bridging, improving air tightness and installing energy efficient ventilation and heating systems.

Flood Risk

The combination of the probability of a flood and the potential adverse consequences associated with a flood, for human health, the environment, cultural heritage and economic activity.

Heritage Assessment

A report which evaluates the impact of a development on the significance of a historic or archaeological site, building and setting.

Historic Environment

All aspects of the environment resulting from the interaction between people and places through time, including all surviving physical remains of past human activity, whether visible, buried or submerged, and landscaped and planted or managed flora.

In-curtilage (parking)

This refers to parking within the property’s boundary, typically to the front or rear of the property.

Large-scale Shared Living Accommodation (Co-living)

Accommodation which provides private rooms alongside shared communal spaces and facilities. This type of accommodation does not constitute self-contained dwellings (Class 9), HMOs, student accommodation, hotels, or other residential institutions.

Listed Building

A Listed Building is a built structure of ‘special architectural or historic interest’. The term ‘building’ can be defined as ‘anything made by people’ such as houses, schools, factories, boundary walls, bridges and sculptures. Listing covers the whole of a building or structure including its exterior, interior and any ancillary structures within its curtilage (provided these were constructed before 1 July 1948). Their selection, assessment and designation is carried out by Historic Environment Scotland under the Planning (Listed Buildings and Conservation Areas) (Scotland) Act 1997. Listed Buildings are managed primarily through the Listed Building Consent process by the appropriate planning authority.

Local Planning Authority

The public authority whose duty it is to carry out specific planning functions for a particular area.

Open Space

All open space of public value, including not just land, but also areas of water (such as rivers, canals, lakes and reservoirs) which offer important opportunities for sport and recreation and can act as visual amenity.

Place Principle

All those responsible for providing services and looking after assets in a place need to work and plan together, and with local communities, to improve the lives of people, support inclusive and sustainable economic growth and create more successful places.

Planning Condition

A condition imposed on a grant of planning permission in accordance with the Town and Country Planning (Scotland) Act 1997.

Planning Obligation

A legal agreement entered into under Section 75 of the Town and Country Planning (Scotland) Act 1997 to mitigate the impacts of a development proposal.

Preliminary Ecological Appraisal

Is the term used to describe the rapid assessment of the ecological features present, or potentially present, within a site and its surrounding area. It normally comprises a desk study and a walkover survey.

Renewable and Low-carbon Energy

Includes energy for heating and cooling as well as generating electricity. Renewable energy covers those energy flows that occur naturally and repeatedly in the environment – from the wind, the fall of water, the movement of the oceans, from the sun and also from the biomass and deep geothermal heat. Low carbon technologies are those that can help reduce emissions (compared to conventional use of fossil fuels).

Serviced Apartments

A furnished rental unit that combines the comfort and privacy of a home with hotel-style services, available for short-term or long-term stays.

Setting of a Heritage Asset

The surroundings in which a heritage asset is experienced. Its extent is not fixed and may change as the asset and its surroundings evolve. Elements of a setting may make a positive or negative contribution to the significance of an asset, may affect the ability to appreciate that significance or may be neutral.

Significance (for heritage policy)

The value of a heritage asset to this and future generations because of its heritage interest. The interest may be archaeological, architectural, artistic or historic. Significance derives not only from a heritage asset’s physical presence, but also from its setting.

Student Accommodation

Residential accommodation specifically built, designed and managed for students, treated as Sui Generis under the Use Classes Order (Scotland) 1997.

Sui Generis

Planning shorthand for a use that falls outside the defined classes in the Use Classes Order (Scotland) 1997 (as amended), such as theatres, amusement centres, places for motor vehicle recreation or firearm sport

Sustainable Urban Drainage (SUDS)

SUDS are drainage solutions that provide an alternative to the direct channelling of surface water through networks of pipes and sewers to nearby watercourses.

Town Centre

Centres which display:

  • a diverse mix of uses, including shopping;
  • high level of accessibility;
  • qualities of character and identity which create a sense of place and further the well-being of communities;
  • wider economic and social activity during the day and in the evening; and
  • integration with residential areas.
Transport Assessment

A comprehensive and systematic process that sets out transport issues relating to a proposed development. It identifies measures required to improve accessibility and safety for all modes of travel, particularly for alternatives to the car such as walking and cycling, and measures that will be needed to deal with the anticipated transport impacts of the development.

Can't find your answer?

Send us your question through the feedback form, email the Project Team at info@summerhallconsultation.co.uk, or ask the team in person at the public event.

Ask a question
Have Your Say